What a cost estimate is made of
A cost estimate prices a job before it runs: material, operations with their times, machine hours, outside work and surcharges. The post-calculation shows afterwards what the job really cost.
The knowledge for this sits in old estimates, in Excel files and in the heads of one or two people. So for a new request, the estimator first looks for a part they've costed before.
Whether an agent can prepare this search and the first draft depends above all on whether your past estimates can be found. Hourly rates, surcharges and risk remain your decision.
What your estimator gets at the end
Every estimate starts with a draft you can trace. Next to each line it says which past job it comes from and which price applies, and the operations where the post-calculation differed back then are marked. Your estimator checks those first.
This is how the draft comes together:
- The agent reads the drawing, bill of materials, material, quantity and date.
- It looks for past estimates with the same material, similar operations and a similar batch size, and copies the operations, times and outside work from the closest job. It names that job.
- If the post-calculation of that job differed, it marks the operations that took more or less time.
- It takes material prices and hourly rates from your system, with the date from which they apply.
At first the agent only suggests. Your estimator adjusts times and surcharges, sets the price and approves the draft.
If there's no comparable part, the agent says so plainly. A new process or a new material is still costed from scratch by your estimator.
What has to be in order first
An agent can only find what's been filed. These five points come before the first draft:
- Cost estimates in one place. In the ERP or in Excel, but findable, with job number and date.
- The post-calculation for the same jobs. Only the comparison shows which assumptions held.
- Hourly rates and surcharges, written down. With the date from which they apply.
- Material prices with a date. So it's clear which price is current.
- Features that make jobs similar. Material, process, dimensions, batch size: which of these is in your data today?
Without the post-calculation, every draft just repeats the old assumptions. Then that's the first step.
What your software can already do
Your ERP or production planning may already have its own costing. Two examples from public sources:
Abacus PPS. The Abacus flyer on production planning and control lists cost estimating and a rolling post-calculation of production orders.[1]
Source: Abacus, flyer “Produktionsplanung und -steuerung”, version 11-2023
Microsoft Dynamics 365 Business Central. On request, Copilot finds an earlier document, such as an old invoice, and suggests its lines for a new quote or order. Microsoft lists the feature as a preview, validated in English.[2][3]
Source: Microsoft Learn
A costing module calculates by your rules. Ask your vendor whether it finds similar past jobs for a new request on its own. If your software can already do that, you don't need an agent for it. In the trial run we put in writing what your software already does on its own.
